Linder Pure Odor Wall Paint

Linder clean wall paint, selection of environmentally friendly high-quality raw materials and advanced technology, the product adopts high-purity essence of the emulsion, fully reacted to form a dense structure of the paint film, after painting the wall is long-lasting, bright as new. At the same time, the product is odorless and enjoys the characteristics of environmentally friendly, large coating area, convenient construction and other performance characteristics, is the best choice for you to enjoy a healthy and warm home environment.

Category:

Product Description

Linder clean wall paint, selection of environmentally friendly high-quality raw materials and advanced technology, the product adopts high-purity essence of the emulsion, fully reacted to form a dense structure of the paint film, after painting the wall is long-lasting bright, bright as new. At the same time, the product has a clean flavor and environmental protection, large painting area, convenient construction and other performance characteristics, is the best choice for you to enjoy a healthy and warm home environment.

Product features

  1. Highly efficient and odorless
  2. Easy construction
  3. Strong adhesion
  4. Good covering

Construction process

Construction method: brushing, roller coating, sprayer

Theoretical paint consumption

Total consumption is about (8-10) square meters/kg/one coat (dry film 30 microns).

Depending on the roughness of the actual surface and the dilution ratio, the amount of paint consumed may vary.

Dilution

In order to facilitate the construction, it can be diluted with ≤10% (v/v) of water according to the actual situation (it can be increased or decreased according to the actual situation);

Mix well before use.

Recoating time (in dry film 30 microns, 25~30℃)

Surface drying: 10 minutes – Hard drying: 30 minutes – Recoating: ≥2 hours

Substrate Requirements

The base should be solid, level, clean and dry.

Maintenance time

7 days/25℃: low temperature (should not be lower than 5℃) appropriate extension, in order to obtain the ideal paint film effect.

Construction conditions

Please do not construct in wet or cold weather (temperature <5℃, relative temperature >85%), otherwise the expected painting effect cannot be achieved.

Cleaning

When stopping in the middle of painting and after finishing, please wash all the instruments with water in time.

substrate treatment

surface treatment Remove surface dust, grease and loose plaster from new walls, repair any holes in time and ensure that the walls are clean, dry and level. Repainting the wall to remove the old wall not solid paint film, remove surface dust chalk and impurities, batch leveling and sanding, clean and thoroughly dry.
surface state Ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10. The surface of the pre-coated substrate must be firm, dry, clean, flat and free of loose material.

Coating system and number of coats

Painting System primers top coat
Construction method “Linder Multi-Functional Anti-Alkali Sealing Primer” once more Two coats of “Linder Clean Wall Paint”.

 

 

Safety matters

  1. Please be sure to read the construction instructions of the product package carefully before use, in order to obtain reliable and satisfactory painting effect;
  2. Open all windows and doors as much as possible before starting operation and use to ensure that the construction area has sufficient ventilation;
  3. in case of allergic skin, always wear protective gears during use; in case of inadvertent contact with eyes, rinse immediately with plenty of water; in case of inadvertent contact with skin and causing persistent pain or irritating sensation, rinse immediately with plenty of water and seek medical assistance;
  4. Do not allow children or pets to enter the construction area and keep the product out of their reach; if accidentally contaminated with children, immediately flush with plenty of water and seek medical assistance;
  5. Do not pour paint into sewers or drains;
  6. dispose of paint waste in accordance with local environmental standards.

Storage

Store tightly closed in a cool and dry place at 0-40℃.

Shelf life: 24 months

 

Guangdong LinderPaint Co., Ltd.

Address:No.1, South Industrial Zone, Dongsheng Town, Xiaolan Town, Zhongshan City, Guangdong Province, China

Tel:0760-22216177

Website:www.linderpaint.com

Company micro-signal:18022181717