Product Description
Linder Multi-functional Anti Alkali Sealing Primer has excellent sealing and alkali resistance, which can effectively protect the wall paint from chemical substances inside the wall. Its excellent penetration and anti-chalking ability can make the topcoat easier to paint, and help to improve the fullness of the topcoat, so that it can achieve the best painting effect.
Product features
- Strong alkaline resistance, strong sealing property
- Strong penetration, strong adhesion
- Wide applicability, strong generality
- Strong water resistance
- Good leveling, convenient construction
- Chemical corrosion resistance, can effectively protect the outer paint film from the strong chemical damage of cement.
Construction process
Construction method: brushing, roller coating, spraying
Theoretical paint consumption
Total consumption is about (8-10) square meters/kg/one coat (dry film 30 microns).
Depending on the roughness of the actual surface and the dilution ratio, the amount of paint consumed may vary.
Dilution
In order to facilitate the construction, it can be diluted with ≤20% (v/v) of water according to the actual situation (it can be increased or decreased according to the situation of the actual situation);
Mix well before use.
Recoating time (in terms of dry film 30 microns, 25~30℃)
Surface drying: 10 minutes -Hard drying: 30 minutes -Recoating: ≥2 hours
Substrate Requirements
The base should be solid, level, clean and dry.
Maintenance time
7 days/25℃: low temperature (should not be lower than 5℃) appropriate extension, in order to obtain the ideal paint film effect.
Construction conditions
Please do not construct in wet or cold weather (air temperature<5℃, relative temperature>85%), otherwise the expected painting effect cannot be achieved.
Cleaning
When stopping in the middle of painting and after finishing, please wash all the instruments with water in time.
substrate treatment
| surface treatment | Remove surface dust, grease and loose plaster from new walls, repair any holes in time and ensure that the walls are clean, dry and level. | Not fixed paint film need to be removed,when repainting the wall, remove surface dust chalk and impurities, batch leveling and sanding, and thoroughly dry. |
| surface state | Ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10. | The surface of the pre-coated substrate must be firm, dry, clean, flat and free of loose material. |
Coating system and number of coats
| Painting System | primers |
| Construction method | “Linder Multi-Functional Anti-Alkali Sealing Primer” once more |
Safety matters
- Please be sure to read the construction instructions of the product package carefully before use, in order to obtain reliable and satisfactory painting effect;
- Open all windows and doors as much as possible before operation and use to ensure that the construction area has sufficient ventilation;
- in case of allergic skin, always wear protective gears during use; in case of inadvertent contact with eyes, rinse immediately with plenty of water; in case of inadvertent contact with skin and causing persistent pain or irritating sensation, rinse immediately with plenty of water and seek medical assistance;
- Do not allow children or pets to enter the construction area and keep the product out of their reach; if accidentally contaminated with children, immediately flush with plenty of water and seek medical assistance;
- Do not pour paint into sewers or drains;
- dispose of paint waste in accordance with local environmental standards.
Storage
Store tightly closed in a cool and dry place at 0-40℃.
Shelf life: 24 months
Guangdong LinderPaint Co., Ltd.
Address:No.1, South Industrial Zone, Dongsheng Town, Xiaolan Town, Zhongshan City, Guangdong Province, China
Tel:0760-22216177
Website:www.linderpaint.com
Company micro-signal:18022181717



Reviews
There are no reviews yet.